Excavation and site preparation
Depending on the pool model and dimensions, excavation takes approximately 2–8 hours and is done mechanically. After excavation, a base layer is placed and precise leveling is performed to ensure the bed is completely flat and stable.
Lowering the pool
The finished PP pool is lowered into the excavation using a crane or forklift and precisely positioned in the prepared bed, with height and geometry control.
External concreting
Plastic (PP) pools are reinforced externally with a concrete jacket, which provides exceptional strength, durability and structural stability.
Commissioning the pool
After concreting, filtration, lighting and additional pool equipment are installed. Upon completion of all installations and checks, the pool is ready for use.